性高爱久久久久久久久,不卡的av在线,国产亚洲日韩欧美,欧美 日韩一区二区视频在线观看

您好,歡迎進(jìn)入北京北廣精儀儀器設(shè)備有限公司網(wǎng)站!
產(chǎn)品列表

—— PROUCTS LIST

相關(guān)新聞

—— NEWS

產(chǎn)品中心Products 當(dāng)前位置:首頁(yè) > 產(chǎn)品中心 > 拉力試驗(yàn)機(jī) > 繩索拉力機(jī) > 鋼絲拉力試驗(yàn)機(jī)

鋼絲拉力試驗(yàn)機(jī)

鋼絲拉力試驗(yàn)機(jī)

簡(jiǎn)要描述:鋼絲拉力試驗(yàn)機(jī)售后服務(wù)及保修承諾:

多年來(lái),我公司一直專(zhuān)業(yè)生產(chǎn)研究電氣試驗(yàn)設(shè)備,經(jīng)研究、摸索、總結(jié)出一套完整的產(chǎn)品服務(wù)保障體系,向用戶(hù)提供優(yōu)質(zhì)及時(shí)的售前、售中、售后服務(wù)

為創(chuàng)造,提高企業(yè)度,樹(shù)立企業(yè)形象,我們本著“一切追求高質(zhì)量,用戶(hù)滿(mǎn)意為宗旨"的精神,以“優(yōu)惠的價(jià)格、周到的服務(wù)、可靠的產(chǎn)品質(zhì)量"的原則向您鄭重承諾:

更新時(shí)間:2024-07-13

產(chǎn)品型號(hào):BWN-20KN

廠商性質(zhì):生產(chǎn)廠家

訪問(wèn)量:837

產(chǎn)品詳情
品牌北廣精儀價(jià)格區(qū)間1萬(wàn)-5萬(wàn)
儀器結(jié)構(gòu)雙立柱最大載荷10KN-100KN
儀器種類(lèi)液壓萬(wàn)能試驗(yàn)機(jī)(WE)應(yīng)用領(lǐng)域化工,農(nóng)業(yè),文體,能源,建材

鋼絲拉力試驗(yàn)機(jī)

示值無(wú)規(guī)律的偏差

Eight, showing the value of deviation is irregular

 

齒桿、齒輪有油污、磨損或有毛刺:消除齒桿、齒輪的油污、毛刺,找出超差時(shí)的齒桿接觸點(diǎn),然后修正齒桿、齒輪;如不能消除誤差.更換齒桿、齒輪。

 rack, gear oil, abrasion or burr: eliminate the rack, gear oil, burr, find out the pole difference when the contact points, and then modified tooth bar, gear; if not eliminate errors. Replace the tooth bar, gear.

 

拉力試驗(yàn)機(jī)試驗(yàn)機(jī)安裝不水平:調(diào)整水平。

tensile testing machine testing machine installation is not level: level adjustment.

 

齒桿彎曲:校直或更換齒桿,調(diào)整滾動(dòng)槽輪的問(wèn)隙。

toothed bar bending: alignment or replacement tooth bar, adjust the roll gap groove wheel.

 

鋼絲拉力試驗(yàn)機(jī)計(jì)算機(jī)軟件聯(lián)機(jī)后出現(xiàn)提示框信息顯示超載。

Nine, computer software on-line prompt box display information overload.

 

解決方案是檢查計(jì)算機(jī)與試驗(yàn)機(jī)的通訊線(xiàn)是否脫落;檢查聯(lián)機(jī)選擇傳感器是否選擇正確;檢查近的試驗(yàn)或操作鍵

The solution is to check the computer and test machine communication line is off; check the online selection of sensor is correct; check the last test or operation keys

 

盤(pán)時(shí)傳感器是否被撞過(guò);檢查出現(xiàn)問(wèn)題之前是否使用了軟件的校準(zhǔn)或標(biāo)定功能;檢查是否手動(dòng)更改過(guò)校準(zhǔn)值、標(biāo)定值或硬件參數(shù)中的其他信息。

When the sensor is knocked off; check whether the use of a software appears calibration or calibration before; check whether the manual modified calibration values, calibration information value or other hardware parameters in the.

 

試驗(yàn)機(jī)主機(jī)電源不亮,不能上下移動(dòng)。

Host ten, the power of the testing machine does not light, not to move up and down.

 

解決方案是檢查接入試驗(yàn)機(jī)的電源線(xiàn)路是否連接正常;檢查急停開(kāi)關(guān)是否處于擰起狀態(tài);檢查接入試驗(yàn)機(jī)的電源電壓是否正常;檢查機(jī)器插座上的保險(xiǎn)是否燒斷,請(qǐng)取出備用保險(xiǎn)絲安裝即可。

The solution is power line inspection access testing machine is connected properly; check the emergency stop switch is in screwed up state; power supply voltage check access testing machine is normal; check the socket on the insurance is burned off, remove the spare fuse can be installed.

 

試驗(yàn)機(jī)主機(jī)電源有電但設(shè)備不可以上下移動(dòng)。

Host eleven, testing machine power supply with power but the equipment can not move up and down.

 

解決方案是檢查是否是15S(時(shí)間)以后設(shè)備還無(wú)法移動(dòng),因?yàn)橹鳈C(jī)開(kāi)機(jī)需要自檢,大概需要15S時(shí)間;檢查上下限位是否再恰當(dāng)?shù)奈恢?,有一定的運(yùn)行空間;檢查接入試驗(yàn)機(jī)的電源電壓是否正常。

The solution is to check whether it is 15S (time) after the device is unable to move, because the host boot take self-inspection, probably need 15S time; check the upper and lower limit is again appropriate position, operating space; check supply voltage access testing machine is normal.

 

油源的保養(yǎng):

Eight, oil source:

 

定期檢查主機(jī)和油源處是否有漏油的地方,如發(fā)現(xiàn)有漏油,應(yīng)及時(shí)更換密封圈或組合墊;

regularly check the host and the supply of oil leaks place, if there is oil leakage, should be promptly replaced seal ring or a combined pad;

 

根據(jù)機(jī)器的使用情況及油的使用期限,定期更換吸油過(guò)濾器和濾芯,更換液壓油。

 according to the use condition and oil machine use period, replace the oil filter and filter periodically, replacing the hydraulic oil.

 

長(zhǎng)時(shí)間不做試驗(yàn)時(shí),注意關(guān)斷主機(jī)電源。如果機(jī)器在待機(jī)狀態(tài),轉(zhuǎn)換開(kāi)關(guān)應(yīng)打到“加載”檔,因?yàn)槿绻D(zhuǎn)換開(kāi)關(guān)打在“快退”檔,電磁換向閥一直在通電狀態(tài),會(huì)影響 該器件的使用壽命。

Experiment 3, not long time, pay attention to shut off the main power. If the machine is in the standby state, the switch should call the "load" file, because if the switch on the "rewind" file, electromagnetic reversing valve has been in a power-on state, affect the service life of the device.

 

控制系統(tǒng)保養(yǎng):

Nine, control system maintenance:

 

定期檢查控制器后面板的連接線(xiàn)是否接觸良好,如有松動(dòng),應(yīng)及時(shí)緊固;

regularly check the controller panel connecting line is good contact, such as loose, should be timely fastening;

 

試驗(yàn)后若有一段較長(zhǎng)的時(shí)間不用機(jī)器時(shí),關(guān)閉控制器和電腦;

after the test if there is a long time not machine closed, controller and computer;

 

控制器上的接口為一一對(duì)應(yīng),插錯(cuò)接口可能對(duì)設(shè)備造成損壞;

the controller interface for the corresponding one one, inserted the wrong interface may cause damage to the equipment;

 

插拔控制器上的接口必須關(guān)閉控制器電源。

Swap Controller Interface must be shut down the power supply controller.

 

 如果你對(duì)BWN-20KN鋼絲拉力試驗(yàn)機(jī)感興趣,想了解更詳細(xì)的產(chǎn)品信息,填寫(xiě)下表直接與廠家聯(lián)系:

留言框

  • 產(chǎn)品:

  • 您的單位:

  • 您的姓名:

  • 聯(lián)系電話(huà):

  • 常用郵箱:

  • 省份:

  • 詳細(xì)地址:

  • 補(bǔ)充說(shuō)明:

  • 驗(yàn)證碼:

    請(qǐng)輸入計(jì)算結(jié)果(填寫(xiě)阿拉伯?dāng)?shù)字),如:三加四=7

北京北廣精儀儀器設(shè)備有限公司 版權(quán)所有 © 2024

ICP備案號(hào):京ICP備13008716號(hào)-5  總流量:183468  管理登陸  技術(shù)支持:化工儀器網(wǎng)  GoogleSitemap